Galvanising bath extraction hood

We were approached by Premier Galvansing Ltd in Corby to look at improving the extraction on their hot dip galvanising bath. This is the first stage of the project was to close off the gaps where the fumes could excape and make a better seal for where the two pipes met. Also smooth out the nasty right angles so that the gasses could move more easily. It was discussed that acid resistant brush strips would be best as they wouldn’t deform as much over time, but would offer least resistance for when crane cables and two fixed opbjects needed to pass.

Before                                                          After

          

Before                                                          After

       

Fabricated parts

   

Stainless steel screen for interceptor tank and wier

Fabrication of bespoke stainless steel filter screen for a petro-chemical works. The original unit was beyond repair and the media used for filteration obsolete so we were asked to come up with a long term solution to the problem. The frame on teh screen can be split into two like a sandwich, so that should the screen material become damaged then it can be easily replaced. The work also included the fabrication from old 1960’s drawings a new water weir tank for the same project, This was fabricated in mild steel and hot dip galvanised afterwards

 

Multiple RORO skip chassis ready for order

IMG_3189 IMG_3188 IMG_3187

Multiple RORO skip chassis, stacked and ready to call off for order. These chassis units are modular and can be fitted with a range of bodies, 15-40cubic yard variants and also specialist skip bodies such as wood chip drying beds as recently enquired. If you would like further details please call us on the details on this site or contact Steve directly at MJL-Skipmaster www.mjl-skipmaster.com

Examples of other skip designs

Abroller.Komm.39826,27_03               IMG_2994

teaserbox_2464176553               Wood-Chip-Drying-container-3-1 Wood-Chip-Drying-container-2 trocknungscontainer-mit-kiemenblech

Sub contract RORO skip building

Working in collaboration with MJL skip master to further increase their range of products. Building of the first prototype RORO (Roll on- Roll off) 20 cubic yard skip, which should be ready for trials very soon.

IMG_0710<img class="alignnone wp-image-616" src="http://www.promechltd.com/wp-content/uploads/sites/18/2016/05/IMG_07711-300×225.jpg" alt="IMG_0771[1]" width="171" height="128" srcset="http://www.promechltd.com/wp-content/uploads/sites/18/2016/05/IMG_07711-300×225.jpg 300w, http://www.promechltd.com/wp-content/uploads/sites/18/2016/05/IMG_07711-768×576.jpg 768w, http://www.promechltd.com/wp-content/uploads/sites/18/2016/05/IMG_07711-1024×768 from this source.jpg 1024w” sizes=”(max-width: 171px) 100vw, 171px” /> IMG_0772 IMG_0951 IMG_0952

All enquiries should be directed to the following link

http://www.mjl-skipmaster.com/

MAILING ADDRESS

Brantons Bridge,
Bourne Road,
Pode Hole,
Spalding,
Lincolnshire,
PE11 3LL

CONTACT INFO

01775 769011
info@mjl-skipmaster.com

Ask to speak with Steve or Paul and I’m sure that they would be more than happy to assist you in any enquires. Keep watching for updates of this exciting new collaboration.